The project implementation plan includes two phases: pre-project preparation and project construction period:

One: Pre-project preparation

1.1 On-site field visits.

1.2 Prepare project feasibility study report.

1.3 Application for project.

1.4 Approval of the project feasibility study report.

1.5 Introduce equipment technology exchange and negotiation.

 Two: Project construction period

2.1 Prepare the preliminary design.

2.2 Initial design approval.

2.3 Construction drawing design.

2.4 Construction design transformation.

2.5 Equipment and material order.

2.6 Construction of civil works and public works.

2.7 Equipment installation and commissioning.

2.8 Single machine test run.

2.9 Joint commissioning.